Faribault Foods
Connecting Link
The Connecting Link project joined two separate production areas for improved circulation and efficiency. By connecting the two buildings, a larger building unit was created which now needed to be reexamined in its entirety with reference to egress, codes and other architectural issues. Fire separations and life safety issues were met or surpassed in an economical structure which meets prevailing regulations.
Standout projects:
Cook Room
Office Addition
Connecting Link
Warehouse
